黄色视频不卡_午夜福利免费观看在线_亚洲国产精品999在线_欧美绝顶高潮抽搐喷水_久久精品成人免费网站_晚上一个人看的免费电影_国产又色又爽无遮挡免费看_成人国产av品久久久

    1. <dd id="lgp98"></dd>
      • <dd id="lgp98"></dd>
        1. 產(chǎn)品推薦:氣相|液相|光譜|質(zhì)譜|電化學(xué)|元素分析|水分測(cè)定儀|樣品前處理|試驗(yàn)機(jī)|培養(yǎng)箱


          化工儀器網(wǎng)>技術(shù)中心>行業(yè)標(biāo)準(zhǔn)>正文

          歡迎聯(lián)系我

          有什么可以幫您? 在線咨詢(xún)

          GMW15919油漆附著力熱沖擊試驗(yàn)標(biāo)準(zhǔn)

          來(lái)源:上海鼎振儀器設(shè)備有限公司   2018年02月07日 13:13  

          undefined

          undefined

          undefined
           

           


          1 Scope
          This procedure is used to determine the resistanceto coating adhesion loss of coated surfaces ofaluminum, plastic, steel, and other substrates when subjected to a wet steam blast similar to thatproduced by vehicle wash equipment.
          Note:  Nothing in this standard supersedesapplicable laws and regulations.
          Note: In the event of conflict between the English
          and domestic language, the English language shall take precedence.
          1.1 Purpose. To determine the resistance to coating adhesion loss of coated surfaces of aluminum, plastic, steel, and other substrates when subjected to a wet steam blast similar to that produced by vehicle wash equipment.
          1.2 Foreword. Not applicable.
          1.3 Applicability. Painted exterior components of vehicle.
          2 References
          Note: Only the latest approved standards are applicable unless otherwise specified.
          2.1 External Standards/Specifications.ISO 2808
          2.2 GM Standards/Specifications.
          3 Resources
          3.1 Facilities. Not applicable.
          3.2 Equipment.
          3.2.1 Test Equipment and Material.
          3.2.1.1 Scribe Tool. A straight-shank tungsten carbide tip, lathe cutting tool or carbide-tipped pencil type tool with tip angle of 60 ± 15 degrees or equivalent.
          3.2.1.2 Razor blade.
          3.2.1.3 Water Bath. Water bath at 38 ± 2°C temperature with 5 ppm maximum dissolved solids as measured utilizing a suitable dissolved solids meter.

          3.2.1.4 Freezer capable of maintaining -29 ± 3°C temperature.
          3.2.1.5 Steam generator.
          Note: Model 100 (and the earlier Model 60) steam generator (from Atomic Steam Co., 10727 Fendell, Detroit MI 48238) has been found to be satisfactory. Milwaukee 1.27 cm ( 1 / 2 in) globe valve 1151 to 1161, 150 Steam Working Pressure,
          300 Water-Oil-Gas,  is  adequate  for  use  in standardization of generator.
          3.2.1.5.1 Input Flow of Water. 2.7 L/minute with a deviation less than 5% (3.2.1.5.1.1).
          3.2.1.5.1.1 Model 100 Steam Generator. The pumping pressure is directly related to the input flow rate. The pressure needed for the required flow can be determined by measuring the pump pressure and discharge flow rate with the burner off. When the burner is turned on, the required flow rate is obtained by readjusting to the required
          pump pressure.
          3.2.1.5.2 Nozzle Diameter. 12.5 mm ID within 2% and at least 100 mm long.
          3.2.1.5.3 Discharge Dynamic Head. 37.9 kPa within ± 5% measured 25 mm from the nozzle using a 47 mm ID tube. A nondiverging discharge is required for this test (3.2.1.5.3.1 and 3.2.1.5.3.2 and Figure 1).
          3.2.1.5.3.1 This is done by placing the tube midstream 25 mm from the nozzle. The tube size must not be varied because the densities and velocities are not uniform throughout the cross section of the discharge stream.
          3.2.1.5.3.2 Adjusting the discharge dynamic head may be required. This must be done in such a way that the input flow rate as specified in 3.1.7.1 is maintained. This is done by adjusting the amount of heat transferred to the water. Increasing the heat will cause the input flow rate to change. It must be readjusted. This operation will result in an
          increased dynamic pressure. To decrease it, decrease the heat and then adjust the flow (pressure).
          3.2.1.6 Face Mask. Full face cover safety mask is required when performing this test.
          3.2.1.7 Gloves. Gauntlet-type gloves for protection of hands are required.
          3.3 Test Vehicle/Test Piece. Not applicable.
          3.4 Test Time. Not applicable.
          3.5 Test Required Information. Not applicable.
          3.6 Personnel/Skills. Not applicable.
          4 Procedure
          4.1 Preparation. Not applicable.
          4.2 Conditions. Not applicable.
          4.2.1 Environmental Conditions. Not applicable.
          4.2.2 Test Conditions. Deviations from the requirements of this standard shall have been agreed upon. Such requirements shall be specified on component drawings, test certificates, reports,etc.
          4.3 Instructions.
          4.3.1 Standardize the Model 100 steam generator.
          4.3.1.1 Measure and maintain the input flow at
          2.7 L/minute.
          4.3.1.1.1 Install a 1.27 cm ( 1 / 2 in) globe valve in the steam line between coil weld assembly and hose nipple, 0.4 cm (5/32 in).
          4.3.1.1.2 With burner off, engage pump and adjust globe valve until 2.7 L/minute is obtained.
          4.3.1.1.3 Record the tank pressure that is obtained with the 2.7 L/minute flow rate. (This induced back pressure simulates the pressure that steam exerts on the system while the burner is on.)
          4.3.1.2 Measure and maintain the mean dynamic head at 37.9 kPa.
          4.3.1.2.1 Open globe valve and turn on the burner.
          4.3.1.2.2 Allow tank pressure to stabilize before reading the mean dynamic head.
          4.3.1.2.3 Adjustments of the dynamic head are to be made by changing the amount of heat transferred to the water at the burner. (The flow rate, as previously specified, must be maintained.)
          4.3.2 Measure and record film thickness at proposed test sites per ISO 2808.
          4.3.3 Immerse the parts or panels (previously prepared per engineering material specification) in the water immersion tank for 3 h at 38 ± 2°C.Aerate the water by placing a 6.5 ram (0.25 in) ID plastic tube at the bottom of the tank and bubble
          air at a rate of 1 bubble per second minimum.Maintain 5 ppm maximum dissolved solids (as NaCl) in the water. Check and record NaCl level using dissolved solids meter.
          4.3.4  Remove  the  samples  after  3 h  and immediay place in freezer at -29 ± 3°C.
          4.3.5 Prepare a suitable rack to hold the test panels.
          4.3.6 Following a 3 h minimum freeze cycle, remove the sample and immediay scribe an X through the coating into the substrate across the entire panel or part where feasible (Figure 2). A razor blade should be used on elastomer substrates. Mount the sample on the test rack.
          4.3.7 Within 60 s from freezer removal, direct the steam blast at the scribe lines for a rain of 30 s.Angle of impingement and distance from the panel are important; care must be taken to ensure the dimensions are adhered to as follows: 45 degree
          angle at a 50 to 75 mm distance (Figure 3).
          4.3.7.1 High pressure wet steam represents a potential safety hazard. Not only is it necessary to secure the samples properly, but full face protection and gloves are required.
          4.3.8 Remove from blast, examine, and report any loss of paint adhesion and/or any blushing (i.e., whitening, loss of gloss) and the average distance of paint adhesive loss from the scribe line.

                             
          undefined
           

           

                                         Figure 1: Measuring the Discharge Dynamic Head

          undefined




                                          Figure 2: Scribe on Panel

          undefined
           

                                         Figure 3: Steam Blast Impingement
          5 Data
          5.1 Calculations. Not applicable.
          5.2 Interpretation of Results. Examine sample for any loss of paint adhesion and/or any blushing (i.e., whitening, loss of gloss) and the average distance of paint adhesive loss from the scribe line.
          5.3 Test Documentation. Report any loss of paint adhesion and/or any blushing (i.e., whitening, loss of gloss) and the average distance of paint
          adhesive loss from the scribe line.
          6 Safety
          This standard may involve hazardous materials, operations, and equipment. This standard does not propose to address all the safety problems associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and  health  practices  and  determine  the applicability of regulatory limitations prior to use.
          7 Notes
          7.1 Glossary. Not applicable.
          7.2 Acronyms, Abbreviations, and Symbols. Not applicable.
          8 Coding System
          This standard shall be referenced in other documents, drawings, etc., as follows:
          Test to GMW15919
          9 Release and Revisions
          9.1 Release. This standard originated in May 2008, replacing GM9525P. It was first approved by Materials Engineering in July 2009. It was first published in July 2009.

          免責(zé)聲明

          • 凡本網(wǎng)注明“來(lái)源:化工儀器網(wǎng)”的所有作品,均為浙江興旺寶明通網(wǎng)絡(luò)有限公司-化工儀器網(wǎng)合法擁有版權(quán)或有權(quán)使用的作品,未經(jīng)本網(wǎng)授權(quán)不得轉(zhuǎn)載、摘編或利用其它方式使用上述作品。已經(jīng)本網(wǎng)授權(quán)使用作品的,應(yīng)在授權(quán)范圍內(nèi)使用,并注明“來(lái)源:化工儀器網(wǎng)”。違反上述聲明者,本網(wǎng)將追究其相關(guān)法律責(zé)任。
          • 本網(wǎng)轉(zhuǎn)載并注明自其他來(lái)源(非化工儀器網(wǎng))的作品,目的在于傳遞更多信息,并不代表本網(wǎng)贊同其觀點(diǎn)和對(duì)其真實(shí)性負(fù)責(zé),不承擔(dān)此類(lèi)作品侵權(quán)行為的直接責(zé)任及連帶責(zé)任。其他媒體、網(wǎng)站或個(gè)人從本網(wǎng)轉(zhuǎn)載時(shí),必須保留本網(wǎng)注明的作品第一來(lái)源,并自負(fù)版權(quán)等法律責(zé)任。
          • 如涉及作品內(nèi)容、版權(quán)等問(wèn)題,請(qǐng)?jiān)谧髌钒l(fā)表之日起一周內(nèi)與本網(wǎng)聯(lián)系,否則視為放棄相關(guān)權(quán)利。
          企業(yè)未開(kāi)通此功能
          詳詢(xún)客服 : 0571-87858618
          孙吴县| 德保县| 罗平县| 康马县| 乌审旗| 图片| 元江| 托克逊县| 陇西县| 镇坪县| 灵川县| 桂东县| 石屏县| 苏尼特左旗| 白玉县| 烟台市| 玉屏| 宣威市| 赤壁市| 固阳县| 阿克| 麻阳| 铜山县| 板桥市| 新乡市| 万安县| 天柱县| 土默特左旗| 临洮县| 郸城县| 错那县| 子洲县| 凉山| 萍乡市| 手游| 遂宁市| 乌鲁木齐市| 武隆县| 丹凤县| 宁强县| 江永县|