黄色视频不卡_午夜福利免费观看在线_亚洲国产精品999在线_欧美绝顶高潮抽搐喷水_久久精品成人免费网站_晚上一个人看的免费电影_国产又色又爽无遮挡免费看_成人国产av品久久久

    1. <dd id="lgp98"></dd>
      • <dd id="lgp98"></dd>
        1. 產(chǎn)品推薦:氣相|液相|光譜|質(zhì)譜|電化學(xué)|元素分析|水分測(cè)定儀|樣品前處理|試驗(yàn)機(jī)|培養(yǎng)箱


          化工儀器網(wǎng)>技術(shù)中心>行業(yè)標(biāo)準(zhǔn)>正文

          歡迎聯(lián)系我

          有什么可以幫您? 在線咨詢

          FORD BI107-05熱沖擊測(cè)試儀

          來(lái)源:上海鼎振儀器設(shè)備有限公司   2018年02月07日 17:39  

          E1
          e2
          e3

           

                                                             Application
          This procedure is used to determine the resistance to coating adhesion loss of coated surfaces of aluminum,plastic, steel, and other substrates when subjected to a wet blast similar to that produced by vehicle wash equipment.

           

           

                                     Apparatus and Materials Required
          Film Thickness Gauge
                per Ford Laboratory Test Method BI 117-01
          Carbide Tip Scribe
                CTS (General Scribe #CM 88) - or equivalent
               12015 egraph Rd.
               Detroit, Michigan U.S.A.
               (313) 531-7668
          Utility Knife
                Stanley, Quick Point 10-300 - or equivalent
               (break away tips)
          Water Immersion Tank
               Per Ford Laboratory Test Method BI 104-01
              Note:  Thermal shock testing requires:
                  a.  38 +/- 2 °C water temperature
                  b.  5 ppm maximum dissolved solids
          Heater/Circulator
                 Fisher Scientific 13-874-70J - or equivalent
          Dissolved Solids Meter
                Myron L Company - or equivalent
                833 East Broadway
                San Gabriel, California
          Freezer
                Capable of minus 29 +/- 2 °C temperature 

          Steam Generator
             a.  Input flow of water to be 2.7 +/- .1 L/min (*).
             b.  Nozzle diameter to be 12.5 +/- .3 mm ID and at least 100 mm long.
             c.  Discharge dynamic head to be 37.9 +/- 1.9 kPa measured 25 mm from the nozzle  using 
          ??       a   4.7 mm ID tube. A substantially non-diverging discharge is required for this test (**) 
          ??    (***) (see Figures 1 and 2).
          Note:  Electro-Magic Model 100 (and the earlier Model 60) Steam Generator available only 
                from:Atomic Cleaning Systems, 31651 West Eight Mile Road, Livonia, MI 48150, Phone: 
          ??       (248) 615-4400, has been found to be satisfactory. The Model 100 or Model 60 are no 
          ??       longermanufactured directly by Electro-Magic. However, Atomic Cleaning Systems is
          ??       capable ofmodifying new Electro-Magic models to meet the Model 100 specifications
                 required for this test.Milwaukee 1/2 inch globe valve No. 1151-1161, 150 SWP 300 WOg
          ??      is adequate for use in  standardization of generator.
          Model 100 Steam Generator
          (*)    The pumping pressure is directly related to the input flow rate. The pressure needed for
                  therequired flow can be determined by measuring the pump pressure and discharge
                  flow rate withthe burner off. When the burner is turned on, the required flow rate is
          ??        obtained by readjusting to the required pump pressure.
          (**)    This is done by placing the tube midstream 25 mm from the nozzle. The tube size must  
          ??         not bevaried because the densities and velocities are not uniform throughout the cross
          ??        section of thedischarge stream.
          (***)  Adjusting the discharge dynamic head may be required. This must be done in such a
                way thatthe input flow rate as specified in Para (a) above is maintained. This is done by
               adjusting the amount of heat transferred to the water. Increasing the heat will cause the
               flow rate (pressure) of (a) to change. It must be readjusted. This operation will result in an
          ??      increased dynamic pressure; to decrease it, decrease the heat and then adjust the flow
          ??    (pressure).

          Thermometer
          ??       Capable of measuring 100 +/- 2 °C
          Face Mask
                Full face cover safety mask is required when performing this test.
          Gloves
               Gauntlet-type gloves for protection of hands are required.


                                              Conditioning and Test Conditions
            All test values indicated herein are based on material conditioned in a controlled atmosphere of 23 +/- 2 ??C and 50 +/- 5 % relative humidity for not less than 24 h prior to testing and tested under the same conditions unless otherwise specified.

                                                                    Procedure
          1.  Standardize the Model 60 or Model 100 Steam Generator.
              a.  Measure and maintain the input flow at 2.7 L/min. Install a 12.5 mm globe valve in the
          ??        steam line between coil weld assembly and a 5/32 inch hose nipple. With burner off,
          ??         engage pump and adjust globe valve until 2.7 L/min is obtained.
                  Record the tank pressure that is obtained with the 2.7 L/min flow rate. (This induced
                   back pressure simulates the pressure that steam exerts on the system while the burner
                   is on.)
             b.  Measure and maintain the mean dynamic head at 37.9 kPa (5.5 psi) using the fixtures as
                 described in Figures 1 and 2. Open globe valve and turn on the burner. Allow tank
          ??       pressure   tostabilize before reading the mean dynamic head. Adjustments of the
                 dynamic head are to be  made by changing the amount of heat transferred to the water
          ??       at the burner. (The flow  rate, as  specified above, must be maintained.)
              c.  Measure and maintain a 98 +/- 2 °C temperature of the steam blast at the test
          ??        sitedistance.

          2.    Measure film thickness per Ford Laboratory Test Method BI 117-01 at proposed test sites
               and record.
          3.  Immerse the parts or panels (previously prepared per Engineering Materials Specification)
          ??     in the water immersion tank for four hours at 38 +/- 2 °C. Aerate the water by placing 6.5
          ??     mm ID plastic tube at the bottom of the tank and bubble air at a rate of one bubble per
          ??     second minimum. Maintain a 5 ppm maximum dissolved solids (as NaCl) in the water.
          ??     Check and record NaCl level using a dissolved solids meter.
          4.  Remove the samples after four hours of water immersion and cut an "X" through the
          ??      coating into the substrate across the panel or part where feasible (see Figure 3).
                a.  Use a scribe to make the cut if the substrate is metal or hard, rigid plastic.
                b.  Use a utility knife to make the cut if substrate is an elastomeric material.
          5.  Place the test samples in a freezer at minus 29 +/- 2 °C for a three hour minimum freeze
              cycle.
          6.  Within 30 seconds from freezer removal, direct the steam blast at the center of the "X" cut,
          ??    at a distance  of 2 to 3 inches and 45° to the sample, in the direction shown in Figure 3.
           Note:  High pressure wet steam represents a potential safety hazard. Not only is it necessary|
                      to secure the samples properly, but full face protection and gloves are required.
          7.  After 30 seconds, record area (mm2) of coating removal by visually measuring with a
          ??      metric ruler  (typical triangular coating removal: Area = 1/2 Base x Height). Also examine
          ??      the surface and report  any blushing, whitening, or loss of gloss.
          8. If a failure occurs, note number of seconds after steam black initiated that the failure 
                occurred.


          Chemicals, materials, parts, and equipment referenced in this document must be used and handled properly.
          Each party is responsible for determining proper use and handling in its facilities.
                                                               ATTACHMENT ONE
                                                                RATING SCALE FOR
                                                       THERMAL SHOCK TEST PANELS

                                                              RATING               PEEL BACK
                                                                      20      =       No removal
                                                                      19      =       < 0.5 cm^2
                                                                      18      =       < 1.0 cm^2
                                                                      17      =       < 1.5 cm^2
                                                                      16      =       < 2.0 cm^2
                                                                      15      =       < 2.5 cm^2
                                                                      14      =       < 3.0 cm^2
                                                                      13      =        < 3.5 cm^2
                                                                      12      =        < 4.0 cm^2
                                                                      11      =        < 4.5 cm^2
                                                                      10      =        < 5.0 cm^2
                                                                       9       =         < 5.5 cm^2
                                                                       8       =         < 6.0 cm^2
                                                                       7       =         < 6.5 cm^2
                                                                       6       =         < 7.0 cm^2
                                                                       5       =         < 7.5 cm^2
                                                                       4       =         < 8.0 cm^2
                                                                       3       =         < 8.5 cm^2
                                                                       2       =         < 9.0 cm^2
                                                                       1       =         < 9.5 cm^2
                                                                       0       =          > 9.5 cm^2
                                            SEE SPECIFICATION FOR ACCEPTANCE CRITERIA RATING

           

          undefined
                                                                  Figure 1

          undefined

                                                                   Figure 2

           undefined
                                                                           Figure 3

          undefined
                                                              Figure 4

          免責(zé)聲明

          • 凡本網(wǎng)注明“來(lái)源:化工儀器網(wǎng)”的所有作品,均為浙江興旺寶明通網(wǎng)絡(luò)有限公司-化工儀器網(wǎng)合法擁有版權(quán)或有權(quán)使用的作品,未經(jīng)本網(wǎng)授權(quán)不得轉(zhuǎn)載、摘編或利用其它方式使用上述作品。已經(jīng)本網(wǎng)授權(quán)使用作品的,應(yīng)在授權(quán)范圍內(nèi)使用,并注明“來(lái)源:化工儀器網(wǎng)”。違反上述聲明者,本網(wǎng)將追究其相關(guān)法律責(zé)任。
          • 本網(wǎng)轉(zhuǎn)載并注明自其他來(lái)源(非化工儀器網(wǎng))的作品,目的在于傳遞更多信息,并不代表本網(wǎng)贊同其觀點(diǎn)和對(duì)其真實(shí)性負(fù)責(zé),不承擔(dān)此類作品侵權(quán)行為的直接責(zé)任及連帶責(zé)任。其他媒體、網(wǎng)站或個(gè)人從本網(wǎng)轉(zhuǎn)載時(shí),必須保留本網(wǎng)注明的作品第一來(lái)源,并自負(fù)版權(quán)等法律責(zé)任。
          • 如涉及作品內(nèi)容、版權(quán)等問(wèn)題,請(qǐng)?jiān)谧髌钒l(fā)表之日起一周內(nèi)與本網(wǎng)聯(lián)系,否則視為放棄相關(guān)權(quán)利。
          企業(yè)未開(kāi)通此功能
          詳詢客服 : 0571-87858618
          伊宁县| 惠来县| 左权县| 灵宝市| 伊宁县| 石阡县| 德钦县| 宁强县| 白山市| 郓城县| 新丰县| 远安县| 瓮安县| 南木林县| 邵东县| 汝城县| 龙胜| 乌拉特中旗| 寿宁县| 安丘市| 绍兴县| 泗洪县| 阳高县| 大渡口区| 来宾市| 株洲市| 旬邑县| 周至县| 仁怀市| 罗源县| 丰宁| 东乡族自治县| 仁怀市| 孝义市| 铁岭市| 五家渠市| 隆子县| 香河县| 奈曼旗| 临朐县| 洛浦县|